Hastings District Council – Flaxmere Waste Pump Station

This job was to design and build a waste pump station for a new subdivision in Flaxmere alongside Pump & Valve. Broad Electrical was issued template electrical drawings to be made site specific. With our in-house electrical design engineer, we were able to complete these. The pump station involves a two-pump system running via a radar level transducer with floats as back up. The Broad Electrical Switchboard Division completed the build of the switchboard.  
Hastings District Council 244 Flaxmere Ave Waste Pump Station